Each step here can vary as all circumstances are different.

modern hair salon with white walls and a peach-colored ceiling. There are several styling stations with mirrors, chairs, and lights. The floor is a light gray tile
modern kitchen with white cabinets and a large kitchen island. The kitchen has a high ceiling with a skylight, and a black refrigerator.
After the initial point of contact with DSA, we will make an appointment to come & see you at a suitable time, to discuss design & measure.
1
We will phone & email a quote to you & discuss your costing options or any variations, at this point if you decide to proceed, we will complete a final check measure & finalise your Joinery drawings for approval.
2
After your designs & finishes have been selected & terms agreed on, we will issue you with a contract, Installation schedule & require a 10% deposit with 40% progress payment to secure your price, order your materials & start production of your Joinery.
3
Before installation of your new kitchen our tradesman will remove your existing kitchen if you require us to do this, we then arrange for a plumber & electrician to come & disconnect any plumbing & electrical should you require.
4
If your floor needs re tiling this will then be arranged around this time.
5
Once your Joinery is manufactured we will contact you to confirm delivery & installation.
6
Your benchtops will then be installed on the same day if they are not stone, if they are stone a stonemason will be in touch to template your benchtops & start production of these tops, this installation can take place up to 10 working days after the final template check measure of your installed project.
7
Splashback or tiles will then be completed after the stone installation
8
Your new appliances & power points will now be re connected.